During the installation process of all shot blasting machines, one must comply with the following rules:
1. The machine is in place: The level and weight of the machine must meet the drawing requirements when it is in place.
2. Sub-component installation should be carried out from bottom to top.
3. Roller conveyor shot blast machines, hook shot blast machines should be installed from inside to outside.
4. Some pre-tests should be carried out during the test run. And then run completely if the result is normal.